Painting has begun and the trench through the concrete flooring has been dug and refilled with the relocated water supply lines and drain.
October 21st | Kitchen Rebuild Index | November 1st

Foyer. We had this repainted to better blend with the family room.

The Trench. (Plus bonus puppy.) This is looking toward the breakfast nook from where the stove used to be.

Breakfast Nook showing water and drain for food prep sink.

Breakfast Nook

Dining Room Entrance

Old Stove New Dishwashing Sink Location

Old Stove New Dishwashing Sink Location

Kitchen Area from Family Room. Note the concrete dust EVERYWHERE...

Fireplace with new mantle in process.