The photos on the following pages were taken during the long process of rebuilding our kitchen after water leak damaged the flooring and cabinets.
The photos have been arranged by date taken to better illustrate the process in a before-during-after style.
The pictures on the following pages are large (800x600) images so they may take some time to load.
May 14th
October 19th
October 21st
October 28th
November 1st
November 13th
November 14th
November 15th
November 17th
November 18th
November 29th